OMAN NATIONAL MUSEUM

Scope of Work: Testing and Balancing of HVAC Systems
Location: Muscat, Oman
Client: Ministry of Heritage and Culture
Consultant: COWI & Partners LLC
Main Contractor: Carillion Alawi LLC
MEP Contractor:  Drake & Scull International

About:
The work consists the construction of three story main building above ground level with annexes including a single storied café building to the east and a single storied Energy centre at the rear portion of the proposed site. Total building floor area calculated as 15430m2.